Поз.
Артикул
Описание
5
PANELLING A-PILLAR,LEFT
8
PANELLING A-PILLAR,RIGHT
11
PANELLING B-PILLAR ON THE LEFT, UNTIL PRODUCTION BREAKPOINT DATE 12.03.2012
14
PANELLING B-PILLAR ON THE LEFT, UNTIL PRODUCTION BREAKPOINT DATE 12.03.2012
17
PANELLING B-PILLAR ON THE RIGHT
20
COVER
23
SPRING
26
MOUNTING
29
TAPPING SCREW BRACKET MOUNTING
32
COTTER PIN ROD TO INTERMEDIATE LEVER
35
PANELLING B-PILLAR ON THE RIGHT
38
PANELLING
41
PANELLING , AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 01.03.08
41
PANELLING , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 29.02.08
44
SOFT STRAP25 MM, ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
47
HOOK STRAP25 MM, ORDER BY THE METER TO BE ADAPTED DURING ASSEMBLY
50
PANELLING LALINEA
53
PANELLING LALINEA
56
SEALING STRIP
59
TAPPING SCREW3.5X19
62
PANELLING
65
SCREWM6X20
66
SEAL WIRE
67
LEAD SEALD9MM
68
SHEET METAL SCREW. SCREWST25X 6 T20
71
WASHER4MM
74
LOCKING CAP
77
PANELLING
80
PANELLING
999
ADHESIVE