1. Главная
  2. Mercedes
  3. BUS
  4. TRAVEGO 17 RHD 3 - ACHSER
  5. 632.007
  6. 81 APPOINTMENTS
  7. 480 PARCEL RACK IL. 1

Mercedes A6326901614 - ZB HALTER / UMLUFTGI

TRAVEGO 17 RHD 3 - ACHSER 632.007
81 APPOINTMENTS - 480 PARCEL RACK IL. 1
  • Поз.
    Артикул
    Описание
  • 5
    PANELLING PARCEL RACK,TOP
  • 8
    PANELLING PARCEL RACK,TOP
  • 11
    PANELLING PARCEL RACK,TOP
  • 14
    PANELLING PARCEL RACK,TOP
  • 17
    PANELLING PARCEL RACK,TOP
  • 35
    PANELLING PARCEL RACK,TOP
  • 71
    FILLET RIGHT CONNECTOR
  • 74
    FILLET LEFT CONNECTOR
  • 77
    PLASTIC SECTION10500MM, TO BE ADAPTED DURING ASSEMBLY, Replaced By: A6328145208
  • 80
    PANELLING FLOOR LUGGAGE SHELF
  • 83
    COVERING357MM, UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
  • 83
    STANCHION218MM, TO BE ADAPTED DURING ASSEMBLY AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 26.01.2009
  • 83
    STANCHION
  • 83
    COVERING STAY 218MM, UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
  • 86
    STANCHION LEFT
  • 86
    COVERING RIGHT, TO BE ADAPTED DURING ASSEMBLY UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
  • 89
    STANCHION RIGHT, AS OF PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 26.01.2009
  • 89
    COVERING LEFT, TO BE ADAPTED DURING ASSEMBLY UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 25.01.2009
  • 92
    GRILLE VENTILATION SCREEN
  • 95
    FASTENING CLIP ROUND
  • 98
    RETAINING DISK
  • 101
    NUTM6
  • 104
    HEXALOBULAR BOLT BRACKET ON TUBULAR SUPPORTING FRAMEWORK M6X12
  • 110
    BRACKET , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2010
  • 113
    BRACKET , UP TO PRODUCTION BREAKPOINT (DISCONTINUATION DATE FOR BCS) 30.09.2010
  • 999
    COVER , AS OF PRODUCTION BREAKPOINT DATE 16.02.04
С любыми вопросами обращайтесь по телефонам
Ответим на Ваши вопросы по электронной почте [email protected]